Recorded at hydroelectric power station CH Leiza in the Ollin river, a few kilometers before converging on the river Urumea. The constant sound of the station is mixed with the sound of water coming down the hill from a channel.
Xabier Erkizia
2016-08-08
mendia, erreka, nafarroa, ura, ibaia, industria, makina, leitzaldea